Statistics and GraphicsΒΆ

In this page, some statistics and graphics from the different FTA projects are shown.

The firsts graphics shown are the number of nodes per project and the number of nodes per calculation model (Constant Probability, Failure Rate, and MTBF). The picture below shows these graphics.

The second graphic shows how long your calculations took, depending on the number of leaves and the number of repetitions of the fault tree. Each point is a calculation: the minimal cut sets, the probability via MCS or the exact probability. Choose a cut set order in the dropdown above the graphic to see the minimal cut sets and the probabilities via MCS calculated with that order; the exact probability does not use the order, so all of them are always shown. The graphic is shown in the picture below.

../_images/stats2.PNG

Note

The graphic only shows the calculations made in your Robin, by you or by the users you can see.

The last graphic shows the distribution of number of leaves based on the probability. The user can see how many leaves are in a specific range of probability (e.g. 0-0.00001) as shown in the picture below.